Selected toll-road research / reviewed 2026-10-22
Grand Parkway System
A TxDOT-reported financing system, not every section of SH 99.
Ownership & control
01 / Public title & project rights
The asset and the business are different claims.
Public state-highway project structure. This record does not certify parcel title across all SH 99 segments.
Scope of this record
TxDOT HB 803 Grand Parkway System perimeter; separately reported county toll projects are excluded.
TxDOT public project / system control
Snapshot 2026-10-22Tables 1 and 3; project perimeter ↗Public system financing reported by TxDOT; security-level issuance inventory pending
Snapshot 2026-10-22Table 1 and public financing perimeter ↗Financial record
Public toll-revenue financing. FY2025 reported debt service is a flow; 2053 is the reported final maturity, not a concession expiry.
TxDOT HB 803 project-reporting schedule, rounded USD millions converted to dollars. These flows are not a debt balance. A separate audited multi-year entity series is not included.
Table 1, PDF p3 ↗Historical changes
No active private-concession expiry is assigned to this public record. A debt maturity is a different event.
No historical changes have been verified for this profile in this release.
Evidence for this profile (1 records)
- TxDOT FY2025 HB 803 toll-project report ↗Reviewed 2026-10-22 · Original PDF retrieved and checked in this release
Geography: Region anchor is an editorial locator. It is not a facility coordinate, alignment or asset boundary. Reviewed 2026-10-22. Source dates and financial periods are stated separately.