Sulayman BowlesIndependent research / Texas
← Texas Infrastructure Ownership Atlas

Selected toll-road research / reviewed 2026-10-22

Grand Parkway System

A TxDOT-reported financing system, not every section of SH 99.

Explore on map ↗

Ownership & control

01 / Public title & project rights

The asset and the business are different claims.

Public state-highway project structure. This record does not certify parcel title across all SH 99 segments.

Scope of this record

TxDOT HB 803 Grand Parkway System perimeter; separately reported county toll projects are excluded.

public controlState of Texas / TxDOT

TxDOT public project / system control

Snapshot 2026-10-22Tables 1 and 3; project perimeter ↗
financing structureState of Texas / TxDOT

Public system financing reported by TxDOT; security-level issuance inventory pending

Snapshot 2026-10-22Table 1 and public financing perimeter ↗

Financial record

Public toll-revenue financing. FY2025 reported debt service is a flow; 2053 is the reported final maturity, not a concession expiry.

Operating revenue$393.32MPeriod ended 2025-08-31
Operations$59.11MPeriod ended 2025-08-31
Repair & maintenance$18.97MPeriod ended 2025-08-31
Debt service$175.38MPeriod ended 2025-08-31

TxDOT HB 803 project-reporting schedule, rounded USD millions converted to dollars. These flows are not a debt balance. A separate audited multi-year entity series is not included.

Table 1, PDF p3 ↗

Historical changes

No active private-concession expiry is assigned to this public record. A debt maturity is a different event.

    No historical changes have been verified for this profile in this release.

    Evidence for this profile (1 records)
    1. TxDOT FY2025 HB 803 toll-project report ↗

      Reviewed 2026-10-22 · Original PDF retrieved and checked in this release

    Geography: Region anchor is an editorial locator. It is not a facility coordinate, alignment or asset boundary. Reviewed 2026-10-22. Source dates and financial periods are stated separately.