Selected toll-road research / reviewed 2026-10-22
Central Texas Mobility Authority portfolio
One authority, two financial boundaries: MoPac is outside the System bond indenture.
Ownership & control
01 / Public title & project rights
The asset and the business are different claims.
Public authority project and toll rights; underlying right-of-way and individual deeds have not been adjudicated here.
Scope of this record
Authority-wide financial reporting includes System and non-System MoPac. 183A, 290, 71, 45SW and 183 projects are not separately capitalized in this Atlas.
Public project / financial interest; see title qualification
Snapshot 2026-10-22PDF p34, Note 1; project rights ↗Public operator
Snapshot 2026-10-22PDF p34, Note 1; project rights ↗Debt creditors; revenue security does not confer road title
Snapshot 2026-10-22Debt notes; individual holders not verified ↗Authority billing plus interoperable tags
Snapshot 2026-10-22Note 1 ↗Financial record
System bonds and loans differ from the non-System MoPac note and CAMPO obligations. Authority-wide debt must not be assigned to one road.
| Metric / period end | Reported value | Basis & evidence |
|---|---|---|
| Reported net toll revenue2025-06-30 | $276,380,417 | audited accrual; entity perimeter retainedPDF p30 ↗ |
| Operating revenue2025-06-30 | $276,583,198 | audited accrual; entity perimeter retainedPDF p30 ↗ |
| Operating expense2025-06-30 | $124,990,708 | audited accrual; entity perimeter retainedPDF p30 ↗ |
| Debt carrying amount2025-06-30 | $2,612,986,634 | audited authority-wide notes and bonds, including unamortized premium; System plus MoPacPDF p50, Notes and Bonds Payable including premium; authority-wide ↗ |
Public audited carrying values and rounded sponsor-reported project debt use different definitions. No statewide total, leverage ranking or return estimate is calculated.
Historical changes
No active private-concession expiry is assigned to this public record. A debt maturity is a different event.
No historical changes have been verified for this profile in this release.
Evidence for this profile (1 records)
- CTRMA FY2025 revised audited financial report ↗Reviewed 2026-10-22 · Primary PDF reviewed through indexed document; revenue and debt rechecked
Geography: Region anchor is an editorial locator. It is not a facility coordinate, alignment or asset boundary. Reviewed 2026-10-22. Source dates and financial periods are stated separately.